Water supply and sewerage

Last updated 2017 years 03 month 15 Date

Notification about the water supply and sewerage

The next time, please notify in advance to the water supply and sewerage engagement.

Times like this Those that get bring Remarks
When you start the use of the water supply and sewerage seal If the payment of a fee is account transfer hope
Please have a financial institution registered seal.
When to stop the use of water supply and sewerage seal
When the user's name is changed seal

Rates of water supply and sewerage (1 months per Li tax, Yen)

Classification Water supply fee Sewerage charge
Basic charge 8㎥ 880 1,120
Overage charges
1m & sup2; per
1㎥~12㎥ 135 190
13㎥~24㎥ 145 230
25㎥~36㎥ 155 270
37㎥~ 165 310

For example, 2m & sup50 in 2 months; in the case of your home you want to use tax,
· Water supply 6,966 circle
· Sewer 9,828 circle
It will be 16,794 circle and match.

Meter reading of water supply water consumption

  • Meter reading of the amount of water used is done to 2 months each (even month).
  • Or place objects on top of the water meter box, to ensure that it is not covered in the garden, etc., also, please do not tie the dog nearby.
  • In renovation, etc. of the house, when the box of the water meter is indoors or under the floor, please contact to the water and sewerage engagement.

Fee payment

  • Sewerage system usage fee has been calculated on the basis of the amount of water used.
  • In both the water supply and sewer rates will pay the 2 months to 2 months of the next month (odd months).
  • Account transfer is, in both the water supply and sewer, (in the case of holiday next business day) last day of the month you do to. Also, if you could not account transfer with insufficient funds, etc., we will carry out account transfer again.
Collection month List and meter reading month in NAGAWA
Use the moon 検針 Collection month
March and April The end of April May
May and June The end of June July
July and August The end of August September
September and October 10 end of the month November
November and December 12 end of the month January
January and February End of February March

Repair work of the water supply

  • Construction work, such as new construction and expansion, repair, removal of the water supply equipment, repair of water leakage from the faucet and piping in the residential land, please sign up to Nagawa-municipal water supply designation water supply equipment construction company. Nagawa-municipal water supply designation water supply equipment construction company, please check with the construction Water Division water supply and sewerage engagement.
  • Since it is considered that excavation by leakage or the like from the water pipe is generated, it is in the vicinity of the water pipe Try to not install the construct.

When performing a sewer drainage construction

Construction work, such as new construction and expansion of the sewage drainage facilities, please apply to NAGAWA sewer drainage designation construction shop. NAGAWA sewer drainage designation construction shop, please check to the construction water service section water and sewage engagement.

Contact Us

Construction Water Division water and sewerage engagement
TEL: 0268-75-2090