Notification about the water supply and sewerage
The next time, please notify in advance to the water supply and sewerage engagement.
Times like this | Those that get bring | Remarks |
---|---|---|
When you start the use of the water supply and sewerage | seal | If the payment of a fee is account transfer hope Please have a financial institution registered seal. |
When to stop the use of water supply and sewerage | seal | |
When the user's name is changed | seal |
Rates of water supply and sewerage (1 months per Li tax, Yen)
Classification | Mouth diameter | Basic charge | Usage fee (XNUM X m3 Atari) | ||||
---|---|---|---|---|---|---|---|
Water supply fee | Pay-as-you-go | Up to XNUM X m3 | 1 ~ 12㎥ |
13 ~ 24㎥ |
25 ~ 36㎥ |
37㎥ ~ |
|
XNUM X mm | 970 | 150 | |||||
XNUM X mm | |||||||
XNUM X mm | |||||||
XNUM X mm | 4,870 | ||||||
XNUM X mm | 8,930 | ||||||
XNUM X mm | 15,070 | ||||||
XNUM X mm | 37,490 | ||||||
XNUM X mm | 70,520 | ||||||
Flat rate | - | 1,960 | - | - | - | - | |
Sewerage charge | 1,120 | 190 | 230 | 270 | 310 |
For example, in the case of household where water diameter is 13mm, 2 month and uses 50 m3,
・ Waterworks XNUM X yen + consumption tax
・ Sewer XNUM X yen + consumption tax
Meter reading of water supply water consumption
- Meter reading of the amount of water used is done to 2 months each (even month).
- Or place objects on top of the water meter box, to ensure that it is not covered in the garden, etc., also, please do not tie the dog nearby.
- In renovation, etc. of the house, when the box of the water meter is indoors or under the floor, please contact to the water and sewerage engagement.
Fee payment
- Sewerage usage fee is calculated based on water usage.
- In both the water supply and sewer rates will pay the 2 months to 2 months of the next month (odd months).
- Account transfer is, in both the water supply and sewer, (in the case of holiday next business day) last day of the month you do to. Also, if you could not account transfer with insufficient funds, etc., we will carry out account transfer again.
Use the moon | Meter reading | Collection month |
March and April | The end of April | May |
May and June | The end of June | July |
July and August | The end of August | September |
September and October | 10 end of the month | November |
November and December | 12 end of the month | January |
January and February | End of February | March |
Repair work of the water supply
- Construction work, such as new construction and expansion, repair, removal of the water supply equipment, repair of water leakage from the faucet and piping in the residential land, please sign up to Nagawa-municipal water supply designation water supply equipment construction company. Nagawa-municipal water supply designation water supply equipment construction company, please check with the construction Water Division water supply and sewerage engagement.
- Since it is considered that excavation by leakage or the like from the water pipe is generated, it is in the vicinity of the water pipe Try to not install the construct.
When performing a sewer drainage construction
Construction work, such as new construction and expansion of the sewage drainage facilities, please apply to NAGAWA sewer drainage designation construction shop. NAGAWA sewer drainage designation construction shop, please check to the construction water service section water and sewage engagement.
Contact Us
Construction Water Division water and sewerage engagement
TEL: 0268-75-2090