• Size of the characters:
  • Small
  • M
  • L

[11/21 Bidding] FYXNUMX Ikoinooka Park Drainage Ditch Installation Work

Published 2022 years 10 month 28 Date

Last updated 2022 years 11 month 01 Date

 
Item Message

Work place

Nagawa Furumachi Ikoinooka Park
Construction completion deadline

January 31, XNUMXth year of ReiwaDay

Site briefing date and time None
Site briefing venue  
Kind of bid Designated competitive bidding
Bid and bid opening date and time From 11:21 am on November 10, 10
Bid and bid opening venue Nagato-cho town 5 meeting room
Contractual provisions By NAGAWA financial rules
Inspection of the design document books and specifications Nagawa Town Office Town Citizen Welfare Division

Design books

00_Construction cost breakdown_FY18_Ikoinooka Park drainage ditches installation work [XLSX: XNUMXKB]

01_Design document_FY4_Ikoi no Oka Park Drainage Installation Work_For posting on the website [PDF: 62KB]

02_Schematic diagram_FY4_Ikoinooka Park Drainage Ditch Construction [PDF: 627KB]

03_ cross section (Ikoi) [PDF: 32KB]

04_ Planar longitudinal structure drawing (Ikoi) [PDF: 95KB]

 

Tender notice

(Bid knowledge)

A person who intends to participate in the first competitive bidding, please bid drawings, design documents, specifications and contract draft, as well as on the site Jukuran aware at the specified location. Bidding documents Amounts, please describe the amount of consumption tax.

(Bidding deposit)

The second NAGAWA financial rules (fiscal 17 years 10 month 1 Date NAGAWA Financial Regulation No. 32) Article 110 and exemption by the second (1) ~ (3) issue.

(Pending successful bid decision)

Depending on the bid price of the person to be the third successful bid, when a performance adapted to the contents of the contract is recognized that there may not be made, or a successful bid to become to a person and a Musubuko the contract, fair order of trading if there is a fear that becomes a disturbing, when deemed significantly inappropriate, you may want to hold a successful bid decision.

Period that are pending successful bid determined by the 2 preceding paragraph, bidders will not be able to withdraw its application.

3 In the case of paragraph 1, when we decide a successful bidder at a later date, we notify the bidder to that effect.

(Set minimum price limit)

For the execution of the fourth bid, we set the minimum limit price.

(Time of contract formation)

The fifth contract shall be concluded within 5 days from the date of the successful bid.

(Expenses required in the contract)

The expenses required for the 6th contract are all borne by the successful bidder.

Map

Field guide map

Contact

Townsman Welfare Division living environment engagement
TEL : 0268-75-2046

The viewing of the PDF you must have Adobe System Inc.'s free software "Adobe Reader". Please obtain from the Adobe Reader download page of the following.

Adobe Reader Download