• Size of the characters:
  • Small
  • M
  • L

[5/24 bid] Reiwa 4th year Oiwake Line 6 pavement repair work

Published 2022 years 04 month 28 Date

Last updated 2022 years 04 month 28 Date

 
Item Message

Work place

Nagawa-cho Daimon character Himekidaira
Construction completion deadline

August XNUMX, XNUMXth year of ReiwaDay

Site briefing date and time From XNUMX:XNUMX am on May XNUMX, XNUMXth year of Reiwa
Site briefing venue Nagato-cho town 5 meeting room
Kind of bid Designated competitive bidding
Bid and bid opening date and time From XNUMX:XNUMX am on May XNUMX, XNUMXth year of Reiwa
Bid and bid opening venue Nagato-cho town 5 meeting room
Contractual provisions By NAGAWA financial rules
Inspection of the design document books and specifications NAGAWA office construction Water Division

Design books

Oiwake No. 6 [ZIP: 2MB]

Tender notice

(Bid knowledge)

A person who intends to participate in the first competitive bidding, please bid drawings, design documents, specifications and contract draft, as well as on the site Jukuran aware at the specified location. Bidding documents Amounts, please describe the amount of consumption tax.

(Bidding deposit)

The second NAGAWA financial rules (fiscal 17 years 10 month 1 Date NAGAWA Financial Regulation No. 32) Article 110 and exemption by the second (1) ~ (3) issue.

(Pending successful bid decision)

Depending on the bid price of the person to be the third successful bid, when a performance adapted to the contents of the contract is recognized that there may not be made, or a successful bid to become to a person and a Musubuko the contract, fair order of trading if there is a fear that becomes a disturbing, when deemed significantly inappropriate, you may want to hold a successful bid decision.

Period that are pending successful bid determined by the 2 preceding paragraph, bidders will not be able to withdraw its application.

3 In the case of paragraph 1, when we decide a successful bidder at a later date, we notify the bidder to that effect.

(Set minimum price limit)

For the execution of the fourth bid, we set the minimum limit price.

(Time of contract formation)

The fifth contract shall be concluded within 5 days from the date of the successful bid.

(Expenses required in the contract)

The expenses required for the 6th contract are all borne by the successful bidder.

Map

Field guide map

Contact Us

Construction Water Division
TEL: 0268-75-2049
FAX: 0268-68-4011