Reiwa XNUMXrd year Wada Osakura waterway improvement work

Published 2021 years 11 month 26 Date

Last updated 2021 years 11 month 26 Date

 

Work place

Wada Osakura
Construction completion deadline March 18, XNUMXth year of Reiwa
Kind of bid Designated competitive bidding
Bid and bid opening date and time From 12:00 am on December XNUMX, XNUMXrd year of Reiwa
Bid and bid opening venue Nagato-cho town 5 meeting room
Contractual provisions By NAGAWA financial rules
Inspection of the design document books and specifications NAGAWA office construction Water Division

On-site briefing session

The briefing session will be canceled from the viewpoint of preventing the spread of new coronavirus infections.

Design books

[Design document without money] Reiwa 614rd year Wada Osakura waterway improvement work [ZIP: XNUMXKB]


Tender notice

(Bid knowledge)

A person who intends to participate in the first competitive bidding, please bid drawings, design documents, specifications and contract draft, as well as on the site Jukuran aware at the specified location. Bidding documents Amounts, please describe the amount of consumption tax.

(Bidding deposit)

The second NAGAWA financial rules (fiscal 17 years 10 month 1 Date NAGAWA Financial Regulation No. 32) Article 110 and exemption by the second (1) ~ (3) issue.

(Pending successful bid decision)

Third, when it is recognized that there is a risk that performance that conforms to the contents of the contract may not be performed depending on the bid price of the person who should make a successful bid, or when a contract is made with a person who should make a successful bid, a fair transaction order can be achieved. If there is a risk of disturbing the bid and it is deemed to be extremely inappropriate, the winning bid decision may be withheld.

 Period that are pending successful bid determined by the 2 preceding paragraph, bidders will not be able to withdraw its application.

 3 In the case of paragraph 1, when we decide a successful bidder at a later date, we notify the bidder to that effect.

(Set minimum price limit)

For the execution of the fourth bid, we set the minimum limit price.

(Time of contract formation)

The fifth contract will be concluded within 5 days from the date of successful bid.

(Expenses required in the contract)

All expenses required for the sixth contract are borne by the highest bidder.

Contact

Construction Water Division
TEL : 0268-75-2049
FAX : 0268-68-4011