• Size of the characters:
  • Small
  • M
  • L

[Heavy rain disaster on August 3, 8rd year of Reiwa] Notice of closure and cancellation of traffic closure (as of 14:8 pm on August 16)

Published 2021 years 08 month 16 Date

Last updated 2021 years 08 month 16 Date

We will inform you from the Nagawa Town Disaster Countermeasures Headquarters.

As of XNUMX:XNUMX pm on August XNUMX, the following areas are closed.

 

Wada district

Town road temporary lodging line (because the danger of the town road on the left bank of Oikawa, which runs from Kubo Gosaro to temporary lodging, is increasing)

 

Nagakubo area  

Town Road Osawa Line (between Town Road Shirakaba Lake Higashimine Line and Osawa XNUMX Bridge)

 

Road closure release information

Traffic restrictions on National Highway No. XNUMX (landslide) have been lifted.

Traffic restrictions on the Daimon main farm road <Yomari Miyanoue Line> (earth and sand inflow) have been lifted.

Traffic restrictions on National Highway No. XNUMX (landslide) have been lifted.

Traffic restrictions on the prefectural road Omegura Nagato Line (inflow of earth and sand) have been lifted.

Traffic restrictions on the Tateiwa Bridge (due to flooding) have been lifted.

Traffic restrictions on the Tateiwashita Bridge (due to flooding) have been lifted.

Contact Us

General Affairs Division in charge of crisis management
Address: 4247-1 Nagano Prefecture Chiisagata-gun NAGAWA old-cho
TEL: 0268-75-2040 (direct) 0268-68-3111 (representative)
FAX: 0268-68-4139