• Size of the characters:
  • Small
  • M
  • L

[5/21 Bid] Reiwa 2 Social Infrastructure Comprehensive Improvement Project (Disaster Prevention / Safety Grant) Town Road Fox Hole Road Road Disaster Prevention Construction

Published 2020 years 05 month 02 Date

Last updated 2020 years 05 month 02 Date

Item Message

Work place

Nawamachi Wada
Construction completion deadline

November XNUMX, XNUMXDay

Kind of bid Designated competitive bidding
Bid and bid opening date and time

Reiwa XNUMX years XNUMXFrom XNUMX:XNUMX am on the XNUMXst of the month

Bid and bid opening venue Nagato-cho town 5 meeting room
Contractual provisions By NAGAWA financial rules
Inspection of the design document books and specifications NAGAWA office construction Water Division

Design books

Fox hole [ZIP: 1MB]

On-site briefing session

New modelCoronavirus OfinfectionDue to the expansion, the briefing session will be canceled. If you have any questions, please submit them in writing (optional) to the person in charge by fax (FAX) by 15:12 on the XNUMXth (Friday).

Tender notice

(Bid knowledge)

A person who intends to participate in the first competitive bidding, please bid drawings, design documents, specifications and contract draft, as well as on the site Jukuran aware at the specified location. Bidding documents Amounts, please describe the amount of consumption tax.

(Bidding deposit)

The second NAGAWA financial rules (fiscal 17 years 10 month 1 Date NAGAWA Financial Regulation No. 32) Article 110 and exemption by the second (1) ~ (3) issue.

(Pending successful bid decision)

Depending on the bid price of the person to be the third successful bid, when a performance adapted to the contents of the contract is recognized that there may not be made, or a successful bid to become to a person and a Musubuko the contract, fair order of trading if there is a fear that becomes a disturbing, when deemed significantly inappropriate, you may want to hold a successful bid decision.

Period that are pending successful bid determined by the 2 preceding paragraph, bidders will not be able to withdraw its application.

3 In the case of paragraph 1, when we decide a successful bidder at a later date, we notify the bidder to that effect.

(Set minimum price limit)

For the execution of the fourth bid, we set the minimum limit price.

(Time of contract formation)

The fifth contract shall be concluded within 5 days from the date of the successful bid.

(Expenses required in the contract)

The expenses required for the 6th contract are all borne by the successful bidder.

地 図

Field guide map

Contact Us

Construction Water Division
PHONE: 0268-75-2049
FAX: 0268-68-4011
Mayor mayor banner

ク イ ッ ク ア ク セ ス