Published 2019 years 10 month 12 Date
Last updated 2019 years 11 month 21 Date
As of 16 (Wednesday) 10, the road regulations and damages in the town are as follows.
(Note: Only confirmed ones.)
[National highway]
- National Route 142 <Old Road Wada Pass>
- National Route 152 <From Yamato Bridge to Daimon Iwai>
* 11 Monday 29 Friday (Friday) from 3 PM.
[Prefectural road]
- Migahara Wada Line
<Nonoiri-ku Migahara Kogengo Villa-Venus Line Junction>
[Town road]
Furimachi area
- Kubo Line 1 (because of the sinking of the right bank road downstream of the Tateiwa Bridge)
- The entire Entsuji Line (for scouring the Akadashibashi Bridge)
- Of Tateiwaokamori Line 2, Tateiwagami Bridge (because of the depression of the downstream right bank road surface, etc.)
- Ushikubi (for fallen trees)
Nagakubo area
- Nakasendo Line (because of the collapse of the former National Route 142, Matsuo Shrine side road)
- Asaoka Line (Asaoka Bridge)
Wada district
- Upper stand line (upper stand bridge)
Contact Us
Construction Water Division construction arable land engagement
TEL : 0268-75-2049
E-mail : kensetsu@town.nagawa.nagano.jp