[10 / 24 tender] Itazawa year Ittorizawa district waterway repair work 2 work area

Published 2019 years 10 month 04 Date

Last updated 2019 years 10 month 04 Date

Work place

Nawamachi Wada
Construction completion deadline December 27
Site briefing date and time From 9:00 am on October 11, 1980
Site briefing venue Nagato-cho town 5 meeting room
Kind of bid Designated competitive bidding
Bid and bid opening date and time From 9:00 am on October 24
Bid and bid opening venue Nagato-cho town 5 meeting room
Contractual provisions By NAGAWA financial rules
Inspection of the design document books and specifications NAGAWA office construction Water Division

Design books

Ittorizawa District Waterway Rehabilitation 2 Work Zone Gold-Free Design [PDF: 5MB]

Ittorizawa District Waterway Renovation Work 2 Work Zone Design Drawing (drawing) [PDF: 152KB]

Breakdown of construction costs (Itotorizawa 2 Industrial Zone) [XLSX: 18KB]


Tender notice

(Bid knowledge)

A person who intends to participate in the first competitive bidding, please bid drawings, design documents, specifications and contract draft, as well as on the site Jukuran aware at the specified location. Bidding documents Amounts, please describe the amount of consumption tax.

(Bidding deposit)

The second NAGAWA financial rules (fiscal 17 years 10 month 1 Date NAGAWA Financial Regulation No. 32) Article 110 and exemption by the second (1) ~ (3) issue.

(Pending successful bid decision)

Depending on the bid price of the person to be the third successful bid, when a performance adapted to the contents of the contract is recognized that there may not be made, or a successful bid to become to a person and a Musubuko the contract, fair order of trading if there is a fear that becomes a disturbing, when deemed significantly inappropriate, you may want to hold a successful bid decision.

2. The tenderer cannot withdraw the application during the period when the successful bid decision is pending according to the preceding paragraph.

3 In the case of Paragraph 1, if a successful bidder is determined at a later date, the bidder will be notified accordingly.

(Set minimum price limit)

For the execution of the fourth bid, we set the minimum limit price.

(Time of contract formation)

The fifth contract will be concluded within 5 days from the date of successful bid.

(Expenses required in the contract)

All expenses required for the sixth contract are borne by the highest bidder.

地 図

Field guide map

Contact Us

Construction Water Division construction arable land engagement
TEL: 0268-75-2049

The viewing of the PDF you must have Adobe System Inc.'s free software "Adobe Reader". Please obtain from the Adobe Reader download page of the following.

Adobe Reader Download
Mayor mayor banner

ク イ ッ ク ア ク セ ス