Published 2018 years 12 month 19 Date
Last updated 2018 years 12 month 20 Date
From April 1, 2011, the water fee will be revised greatly.
The revised points of this time are as follows.
- We will revise the basic fee which was all the same until now by caliber (meter caliber).
- We will unify excess charge exceeding the basic water volume (8 m3) to 150 yen per m3.
- We will revise the annual amount of the villa flat rate system fee.
※ (Note) Sewerage charge is not revised this time, so there is no change.
For details, please refer to the following documents.
Contact Us
Construction Water Division water and sewerage engagement
TEL: 0268-75-2090
The viewing of the PDF you must have Adobe System Inc.'s free software "Adobe Reader". Please obtain from the Adobe Reader download page of the following.
Adobe Reader Download