【10 / 16 bid】 Heisei 30 Year Social Capital Development General Grant Project (Disaster Prevention / Safety Grant) Town Doko-cho Nagakubo Line Road Improvement Work 1 District

Published 2018 years 09 month 28 Date

Last updated 2018 years 09 month 28 Date

item Your Comments

Work place

NAGAWA Nagakubo
Construction completion deadline

Heisei 31 - 31 - 31Sun

Site briefing date and time From 9:10 am on October 1, Heisei 30
Site briefing venue Nagato-cho town 5 meeting room
Kind of bid Designated competitive bidding
Bid and bid opening date and time From 9:10 am on October 16, 1990
Bid and bid opening venue Nagato-cho town 5 meeting room
Contractual provisions By NAGAWA financial rules
Inspection of the design document books and specifications NAGAWA office construction Water Division

Design books

Opinion design document _ Nagakubo Line 1 Industrial Zone [PDF: 112KB]

Published Unit Price List _ Nagakubo 1 Industrial Zone [PDF: 88KB]

Condition Explicit _ Nagakubo 1 Industrial Zone [PDF: 860KB]

Drawing _ Nagakubo 1 Industrial Zone [PDF: 1MB]

Quantity calculation _ Nagakubo 1 Industrial Zone [PDF: 728KB]

Construction cost breakdown document [XLSX: 18KB]

Tender notice

(Bid knowledge)

A person who intends to participate in the first competitive bidding, please bid drawings, design documents, specifications and contract draft, as well as on the site Jukuran aware at the specified location. Bidding documents Amounts, please describe the amount of consumption tax.

(Bidding deposit)

第2 長和町財務規則(平成17年10月1日長和町財務規則第32号)第110条第(1)~(3)号により免除します。

(Pending successful bid decision)

Depending on the bid price of the person to be the third successful bid, when a performance adapted to the contents of the contract is recognized that there may not be made, or a successful bid to become to a person and a Musubuko the contract, fair order of trading if there is a fear that becomes a disturbing, when deemed significantly inappropriate, you may want to hold a successful bid decision.

Period that are pending successful bid determined by the 2 preceding paragraph, bidders will not be able to withdraw its application.

3 In the case of paragraph 1, when we decide a successful bidder at a later date, we notify the bidder to that effect.

(Set minimum price limit)

For the execution of the fourth bid, we set the minimum limit price.

(Time of contract formation)

The fifth contract shall be concluded within 5 days from the date of the successful bid.

(Expenses required in the contract)

The expenses required for the 6th contract are all borne by the successful bidder.

地 図

Field guide map

Contact Us

Construction Water Division
TEL: 0268-75-2049
FAX: 0268-68-4011

The viewing of the PDF you must have Adobe System Inc.'s free software "Adobe Reader". Please obtain from the Adobe Reader download page of the following.

Adobe Reader Download